FAR 52.236-22 - Design Within Funding Limitations
Prescribed in 36.609-1(c) | |
Effective Date: | 1 April 1984 |
Clause or Provision: | Clause |
Provision or Clause Number: | 52.236-22 - Design Within Funding Limitations |
Principle Type And/Or Purpose of Contract: | |
Required: | |
Applicable: | Architect-Engineering |
Optional: | Utility Services; Simplified Acquisition Procedures (Excludes Micro-Purchase); Facilities; Indefinite Delivery; Dismantling, Demolition or Removal of Improvements; Leasing of Motor Vehicles; Fixed Price, Construction; Time & Material/Labor Hour; Cost Reimbursement, Construction; Fixed Price, Service; Cost Reimbursement, Supply; Cost Reimbursement, Service |
Subject: | |
ProcurementType: | |
Contract Threshold: | |
Prescription Overview: |
Prescription |
Clause Overview: |
Clause(a) The Contractor shall accomplish the design services required under this contract so as to permit the award of a contract, using standard Federal Acquisition Regulation procedures for the construction of the facilities designed at a price that does not exceed the estimated construction contract price as set forth in paragraph (c) of this clause. When bids or proposals for the construction contract are received that exceed the estimated price, the contractor shall perform such redesign and other services as are necessary to permit contract award within the funding limitation. These additional services shall be performed at no increase in the price of this contract. However, the Contractor shall not be required to perform such additional services at no cost to the Government if the unfavorable bids or proposals are the result of conditions beyond its reasonable control.
|
Important Notes/Requirements: | |
Subcontract Threshold: | |
Incorporated by Reference: | Yes |
Uniform Contract Format: | |
Editor: | Marshall |