FAR 52.236-21 - Specifications and Drawings for Construction
Prescribed in 36.521 | ||
Effective Date: | 1 February 1997 | |
Clause or Provision: | Clause | |
Provision or Clause Number: | 52.236-21 - Specifications and Drawings for Construction | |
Principle Type And/Or Purpose of Contract: | ||
Required: | ||
Applicable: | Dismantling, Demolition or Removal of Improvements; Fixed Price, Construction | |
Optional: | Utility Services; Simplified Acquisition Procedures (Excludes Micro-Purchase); Facilities; Indefinite Delivery; Leasing of Motor Vehicles; Time & Material/Labor Hour; Cost Reimbursement, Construction; Fixed Price, Service; Cost Reimbursement, Supply; Cost Reimbursement, Service | |
Subject: | ||
ProcurementType: | ||
Contract Threshold: | ||
Prescription Overview: |
Prescription | |
Clause Overview: |
Clause(a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.
AlternatesAlternate I (Apr 1984)When record shop drawings are required and reproducible shop drawings are needed, add the following sentences to paragraph (g) of the basic clause: Upon completing the work under this contract, the Contractor shall furnish a complete set of all shop drawings as finally approved. These drawings shall show all changes and revisions made up to the time the equipment is completed and accepted. Alternate II (Apr 1984)When record shop drawings are required and reproducible shop drawings are not needed, the following sentences shall be added to paragraph (g) of the basic clause: Upon completing the work under this contract, the Contractor shall furnish _____ [Contracting Officer complete by inserting desired amount] sets of prints of all shop drawings as finally approved. These drawings shall show changes and revisions made up to the time the equipment is completed and accepted. | |