Difference between revisions of "Basis of Estimate"
From Knowledge base
Line 1: | Line 1: | ||
+ | ==Overview== | ||
+ | |||
+ | The basis of estimate should be captured by the estimator, and documented within the estimators files. In addition, the basis of estimate should be included in the [[Proposal Narrative]]. | ||
+ | |||
==Guidance== | ==Guidance== | ||
+ | |||
The FAA produces guidance related to documentation requirements for Basis of Estimate. To see the guidance, click on the link below: | The FAA produces guidance related to documentation requirements for Basis of Estimate. To see the guidance, click on the link below: | ||
+ | |||
[[File:GUIDELINES FOR DOCUMENTING COST BASIS OF ESTIMATE 4 1 15 (FAA).pdf]] | [[File:GUIDELINES FOR DOCUMENTING COST BASIS OF ESTIMATE 4 1 15 (FAA).pdf]] | ||
+ | |||
[[Category:Estimating System]] | [[Category:Estimating System]] | ||
[[Category:Bid and Proposal]] | [[Category:Bid and Proposal]] |
Revision as of 14:26, 12 May 2015
Overview
The basis of estimate should be captured by the estimator, and documented within the estimators files. In addition, the basis of estimate should be included in the Proposal Narrative.
Guidance
The FAA produces guidance related to documentation requirements for Basis of Estimate. To see the guidance, click on the link below:
File:GUIDELINES FOR DOCUMENTING COST BASIS OF ESTIMATE 4 1 15 (FAA).pdf