Pre-Contract costs [1]

Allowable or Unallowable?

Allowable with limitations.

FAR Summary

Precontract costs means costs incurred before the effective date of the contract directly pursuant to the negotiation and in anticipation of the contract award when such incurrence is necessary to comply with the proposed contract delivery schedule. These costs are allowable to the extent that they would have been allowable if incurred after the date of the contract (see 31.109).

References and Notes

  1. FAR 31.205-32